1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
|
<HTML><HEAD>
<TITLE>Tcl API Reference -- ns_schedule_weekly</TITLE>
<LINK rel=Previous href="tapi-114.htm">
<LINK rel=ToC href="toc.htm">
<LINK rel=Index href="master.htm">
<LINK rel=Next href="tapi-116.htm">
</HEAD><BODY BGCOLOR="#ffffff"><A NAME="topofpage"></A>
<TABLE WIDTH=100%>
<TR>
<TD ALIGN=LEFT>
<A NAME="topofpage"></A> <IMG SRC="as-c-sm.gif">
</TD>
<TD ALIGN=RIGHT>
<A href="tapi-114.htm"><IMG BORDER="0" src=navbprev.gif alt="[ Previous ]"></A>
<A href=toc.htm> <IMG BORDER="0" src=navbhome.gif alt="[ Contents ]"></A>
<A href=master.htm> <IMG BORDER="0" src=navbhelp.gif alt="[ Index ]"></A>
<A href="tapi-116.htm"> <IMG BORDER="0" src=navbnext.gif alt="[ Next ]"></A>
<A name="7983"> </A>
</TD>
</TR>
</TABLE>
<a name="81782">
</a><h3>ns_schedule_weekly</h3>
<a name="81783">
</a><h4>Overview</h4>
<p><a name="81784">
</a>Schedule a procedure to run once a week</p>
<a name="81785">
</a><h4>Syntax</h4>
<p><a name="81786">
</a><b>ns_schedule_weekly</b> ?-thread? ?-once? <i>day hour minute </i>{<i>script</i> | <i>procname </i>?<i>args</i>?}</p>
<a name="81787">
</a><h4>Description</h4>
<p><a name="81788">
</a><b>ns_schedule_weekly</b> runs the specified Tcl <i>script</i> or procedure (<i>procname</i>) once a week on the day specified by <i>day</i> and the time specified by <i>hour</i> and <i>minute</i>. The day can be from 0 to 6, where 0 represents Sunday. The <i>hour</i> can be from 0 to 23, and the <i>minute</i> can be from 0 to 59.</p>
<p><a name="81789">
</a>Specify -thread if you want a thread created to run the procedure. This will allow the scheduler to continue with other scheduled procedures. Specifying -thread is appropriate in situations where the script will not return immediately, such as when the script performs network activity.</p>
<p><a name="81790">
</a>Specify -once if you want the script to run only one time. The default is that the script will be re-scheduled after each time it is run.</p>
<p><a name="81791">
</a><b>ns_schedule_weekly</b> returns an id number for the scheduled procedure that is needed to stop the scheduled procedure with <b>ns_unschedule_proc</b>.</p>
<TABLE BORDER="2" CELLPADDING="1" width="100%">
<TR><TD COLSPAN=3><P ALIGN=Center>
<IMG SRC="bluebult.gif">
<A HREF="#topofpage">
<FONT SIZE=-1>Top of Page</FONT></A>
<IMG SRC="bluebult.gif">
</TD></TR>
<TR><TD COLSPAN=3><P ALIGN=Center>
<A href="tapi-114.htm">
<IMG BORDER="0" src=navbprev.gif alt="[ Previous ]"></A>
<A href=toc.htm>
<IMG BORDER="0" src=navbhome.gif alt="[ Contents ]"></A>
<A href=master.htm>
<IMG BORDER="0" src=navbhelp.gif alt="[ Index ]"></A>
<A href="tapi-116.htm">
<IMG BORDER="0" src=navbnext.gif alt="[ Next ]"></A>
<BR align=center>
<FONT size=-1>Copyright © 1998-99 America Online,
Inc.</FONT>
</TD></TR></TABLE></BODY></HTML>
|