File: DIR_METADATA
package info
(click to toggle)
chromium 138.0.7204.183-1~deb12u1
- links: PTS, VCS
- area: main
- in suites: bookworm-proposed-updates
- size: 6,080,960 kB
- sloc: cpp: 34,937,079; ansic: 7,176,967; javascript: 4,110,704; python: 1,419,954; asm: 946,768; xml: 739,971; pascal: 187,324; sh: 89,623; perl: 88,663; objc: 79,944; sql: 50,304; cs: 41,786; fortran: 24,137; makefile: 21,811; php: 13,980; tcl: 13,166; yacc: 8,925; ruby: 7,485; awk: 3,720; lisp: 3,096; lex: 1,327; ada: 727; jsp: 228; sed: 36
file content (1 line) | stat: -rw-r--r-- 82 bytes | parent folder | download | duplicates (6) |
1 |
|