File: COMMON_METADATA
package info
(click to toggle)
chromium 139.0.7258.127-1~deb13u1
- links: PTS, VCS
- area: main
- in suites:
- size: 6,122,096 kB
- sloc: cpp: 35,100,771; ansic: 7,163,530; javascript: 4,103,002; python: 1,436,920; asm: 946,517; xml: 746,709; pascal: 187,653; perl: 88,691; sh: 88,436; objc: 79,953; sql: 51,488; cs: 44,583; fortran: 24,137; makefile: 22,147; tcl: 15,277; php: 13,980; yacc: 8,984; ruby: 7,485; awk: 3,720; lisp: 3,096; lex: 1,327; ada: 727; jsp: 228; sed: 36
file content (6 lines) | stat: -rw-r--r-- 88 bytes | parent folder | download | duplicates (45) |
1 |
|