File: COMMON_METADATA
package info
(click to toggle)
chromium 140.0.7339.127-1
- links: PTS, VCS
- area: main
- in suites: forky, sid
- size: 6,192,880 kB
- sloc: cpp: 35,093,808; ansic: 7,161,670; javascript: 4,199,694; python: 1,441,797; asm: 949,904; xml: 747,503; pascal: 187,748; perl: 88,691; sh: 88,248; objc: 79,953; sql: 52,714; cs: 44,599; fortran: 24,137; makefile: 22,114; tcl: 15,277; php: 13,980; yacc: 9,000; ruby: 7,485; awk: 3,720; lisp: 3,096; lex: 1,327; ada: 727; jsp: 228; sed: 36
file content (6 lines) | stat: -rw-r--r-- 88 bytes | parent folder | download | duplicates (41) |
1 |
|