File: README.md
package info
(click to toggle)
chromium 141.0.7390.65-1
- links: PTS, VCS
- area: main
- in suites: forky
- size: 6,246,236 kB
- sloc: cpp: 35,264,825; ansic: 7,169,920; javascript: 4,250,185; python: 1,460,623; asm: 950,788; xml: 751,717; pascal: 187,972; sh: 89,459; perl: 88,691; objc: 79,953; sql: 53,924; cs: 44,622; fortran: 24,137; makefile: 22,313; tcl: 15,277; php: 14,018; yacc: 8,995; ruby: 7,553; awk: 3,720; lisp: 3,096; lex: 1,330; ada: 727; jsp: 228; sed: 36
file content (21 lines) | stat: -rw-r--r-- 994 bytes | parent folder | download | duplicates (7) |
1 |
|