File: DIR_METADATA
package info
(click to toggle)
chromium 143.0.7499.109-1
- links: PTS, VCS
- area: main
- in suites: forky
- size: 5,786,824 kB
- sloc: cpp: 35,783,839; ansic: 7,477,365; javascript: 3,962,116; python: 1,480,521; xml: 764,832; asm: 710,816; pascal: 188,028; sh: 88,717; perl: 88,692; objc: 79,984; sql: 57,625; cs: 42,265; fortran: 24,101; makefile: 22,509; tcl: 15,277; php: 14,018; yacc: 9,043; ruby: 7,553; awk: 3,720; lisp: 3,233; lex: 1,330; ada: 727; jsp: 228; sed: 36
| file content (1 line) | stat: -rw-r--r-- 82 bytes | parent folder | download | duplicates (8) |
1 |
|
