File: include_external_msproject.rst
package info
(click to toggle)
cmake 3.31.6-2
- links: PTS, VCS
- area: main
- in suites: forky, sid, trixie
- size: 142,992 kB
- sloc: ansic: 393,437; cpp: 288,767; sh: 3,958; yacc: 3,240; python: 3,015; lex: 1,337; asm: 438; f90: 429; lisp: 375; cs: 270; java: 266; perl: 217; objc: 212; xml: 198; fortran: 137; makefile: 96; javascript: 83; pascal: 63; tcl: 55; php: 25; ruby: 22
file content (28 lines) | stat: -rw-r--r-- 1,161 bytes | parent folder | download | duplicates (3) |
1 |
|