File: include_external_msproject.rst

package info (click to toggle)
cmake 4.3.0-1
  • links: PTS, VCS
  • area: main
  • in suites: sid
  • size: 158,704 kB
  • sloc: ansic: 406,077; cpp: 309,512; sh: 4,233; python: 3,696; yacc: 3,109; lex: 1,279; f90: 538; asm: 471; lisp: 375; java: 310; cs: 270; fortran: 239; objc: 215; perl: 213; xml: 198; makefile: 110; javascript: 83; pascal: 63; tcl: 55; php: 25; ruby: 22; sed: 2
file content (28 lines) | stat: -rw-r--r-- 1,161 bytes parent folder | download | duplicates (7)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
include_external_msproject
--------------------------

Include an external Microsoft project file in the solution file produced
by :ref:`Visual Studio Generators`. Ignored on other generators.

.. code-block:: cmake

  include_external_msproject(projectname location
                             [TYPE projectTypeGUID]
                             [GUID projectGUID]
                             [PLATFORM platformName]
                             dep1 dep2 ...)

Includes an external Microsoft project in the generated solution file.
This will create a target named ``[projectname]``.
This can be used in the :command:`add_dependencies`
command to make things depend on the external project.

``TYPE``, ``GUID`` and ``PLATFORM`` are optional parameters that allow one to
specify the type of project, id (``GUID``) of the project and the name of
the target platform.  This is useful for projects requiring values
other than the default (e.g.  WIX projects).

.. versionadded:: 3.9
  If the imported project has different configuration names than the
  current project, set the :prop_tgt:`MAP_IMPORTED_CONFIG_<CONFIG>`
  target property to specify the mapping.