File: CustomGuid-check.cmake

package info (click to toggle)
cmake 4.3.0-1
  • links: PTS, VCS
  • area: main
  • in suites:
  • size: 158,704 kB
  • sloc: ansic: 406,077; cpp: 309,512; sh: 4,233; python: 3,696; yacc: 3,109; lex: 1,279; f90: 538; asm: 471; lisp: 375; java: 310; cs: 270; fortran: 239; objc: 215; perl: 213; xml: 198; makefile: 110; javascript: 83; pascal: 63; tcl: 55; php: 25; ruby: 22; sed: 2
file content (1 line) | stat: -rw-r--r-- 69 bytes parent folder | download | duplicates (5)
1
include(${CMAKE_CURRENT_LIST_DIR}/CustomGuid-check-${sln_ext}.cmake)