File: VSCSharpReference-check.cmake

package info (click to toggle)
cmake 4.3.0-1
  • links: PTS, VCS
  • area: main
  • in suites:
  • size: 158,704 kB
  • sloc: ansic: 406,077; cpp: 309,512; sh: 4,233; python: 3,696; yacc: 3,109; lex: 1,279; f90: 538; asm: 471; lisp: 375; java: 310; cs: 270; fortran: 239; objc: 215; perl: 213; xml: 198; makefile: 110; javascript: 83; pascal: 63; tcl: 55; php: 25; ruby: 22; sed: 2
file content (36 lines) | stat: -rw-r--r-- 956 bytes parent folder | download | duplicates (8)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
file(READ "${RunCMake_TEST_BINARY_DIR}/internal.vcxproj" all_build)

string(REGEX MATCH
  "<ProjectReference.Include=.external.csproj.>.*</ProjectReference>"
  ProjectReference
  ${all_build}
)

if(ProjectReference STREQUAL "")
  set(RunCMake_TEST_FAILED "${test} is being set unexpectedly.")
else()
  string(REGEX MATCH
    "<ReferenceOutputAssembly>.*</ReferenceOutputAssembly>"
    ReferenceOutputAssembly
    ${ProjectReference}
  )

  if(NOT ReferenceOutputAssembly STREQUAL "")
    string(REPLACE
      "<ReferenceOutputAssembly>"
      ""
      ReferenceOutputAssemblyValue
      ${ReferenceOutputAssembly}
    )
    string(REPLACE
      "</ReferenceOutputAssembly>"
      ""
      ReferenceOutputAssemblyValue
      ${ReferenceOutputAssemblyValue}
    )

    if(ReferenceOutputAssemblyValue MATCHES "[Fa][Ll][Ss][Ee]")
      set(RunCMake_TEST_FAILED "Referenced C# project with ReferenceOutputAssembly set to false.")
    endif()
  endif()
endif()