File: macro-fusion-last.mir

package info (click to toggle)
llvm-toolchain-13 1%3A13.0.1-11
  • links: PTS, VCS
  • area: main
  • in suites: bookworm
  • size: 1,418,840 kB
  • sloc: cpp: 5,290,826; ansic: 996,570; asm: 544,593; python: 188,212; objc: 72,027; lisp: 30,291; f90: 25,395; sh: 24,898; javascript: 9,780; pascal: 9,398; perl: 7,484; ml: 5,432; awk: 3,523; makefile: 2,913; xml: 953; cs: 573; fortran: 539
file content (28 lines) | stat: -rw-r--r-- 1,058 bytes parent folder | download | duplicates (24)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
# RUN: llc -o - %s -mtriple=aarch64-- -mattr=+arith-bcc-fusion -run-pass postmisched | FileCheck %s --check-prefixes=CHECK,FUSION
# RUN: llc -o - %s -mtriple=aarch64-- -mattr=-arith-bcc-fusion -run-pass postmisched | FileCheck %s --check-prefixes=CHECK,NOFUSION
# Make sure the last instruction is correctly macro-fused when scheduling
# top-down (post-ra).
---
# CHECK-LABEL: name: fuse_last
# CHECK: $x1 = LDRXui $x0, 0
# NOFUSION: $xzr = SUBSXri killed $x2, 0, 0, implicit-def $nzcv
# CHECK: STRXui killed $x0, killed $x1, 0
# FUSION: $xzr = SUBSXri killed $x2, 0, 0, implicit-def $nzcv
# CHECK: Bcc 1, %bb.1, implicit killed $nzcv
name: fuse_last
tracksRegLiveness: true
body: |
  bb.0:
    liveins: $x0, $x2

    $x1 = LDRXui $x0, 0
    ; There is latency between these two instructions tempting the scheduler to
    ; move the SUBSXri in between them. However doing so breaks macro fusion.
    STRXui $x0, $x1, 0

    $xzr = SUBSXri $x2, 0, 0, implicit-def $nzcv
    Bcc 1, %bb.1, implicit killed $nzcv

  bb.1:
    RET_ReallyLR implicit undef $x0
...