File: macro-fusion-last.mir

package info (click to toggle)
llvm-toolchain-9 1%3A9.0.1-16.1
  • links: PTS, VCS
  • area: main
  • in suites:
  • size: 882,388 kB
  • sloc: cpp: 4,167,636; ansic: 714,256; asm: 457,610; python: 155,927; objc: 65,094; sh: 42,856; lisp: 26,908; perl: 7,786; pascal: 7,722; makefile: 6,881; ml: 5,581; awk: 3,648; cs: 2,027; xml: 888; javascript: 381; ruby: 156
file content (28 lines) | stat: -rw-r--r-- 1,058 bytes parent folder | download | duplicates (24)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
# RUN: llc -o - %s -mtriple=aarch64-- -mattr=+arith-bcc-fusion -run-pass postmisched | FileCheck %s --check-prefixes=CHECK,FUSION
# RUN: llc -o - %s -mtriple=aarch64-- -mattr=-arith-bcc-fusion -run-pass postmisched | FileCheck %s --check-prefixes=CHECK,NOFUSION
# Make sure the last instruction is correctly macro-fused when scheduling
# top-down (post-ra).
---
# CHECK-LABEL: name: fuse_last
# CHECK: $x1 = LDRXui $x0, 0
# NOFUSION: $xzr = SUBSXri killed $x2, 0, 0, implicit-def $nzcv
# CHECK: STRXui killed $x0, killed $x1, 0
# FUSION: $xzr = SUBSXri killed $x2, 0, 0, implicit-def $nzcv
# CHECK: Bcc 1, %bb.1, implicit killed $nzcv
name: fuse_last
tracksRegLiveness: true
body: |
  bb.0:
    liveins: $x0, $x2

    $x1 = LDRXui $x0, 0
    ; There is latency between these two instructions tempting the scheduler to
    ; move the SUBSXri in between them. However doing so breaks macro fusion.
    STRXui $x0, $x1, 0

    $xzr = SUBSXri $x2, 0, 0, implicit-def $nzcv
    Bcc 1, %bb.1, implicit killed $nzcv

  bb.1:
    RET_ReallyLR implicit undef $x0
...