1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
|
./noteam.dat:10:10: info: Survey has no fixed points. Therefore I've fixed GX1 at (0,0,0)
Removing trailing traverses...
Concatenating traverses...
Simplifying network...
Calculating network...
Calculating traverses...
Calculating trailing traverses...
Calculating statistics...
Survey contains 2 survey stations, joined by 1 leg.
There are 0 loops.
Total length of survey legs = 0.52m ( 0.52m adjusted)
Total plan length of survey legs = 0.52m
Total vertical length of survey legs = 0.02m
Vertical range = 0.02m (from GX1 at 0.00m to GX2 at -0.02m)
North-South range = 0.51m (from GX2 at 0.51m to GX1 at 0.00m)
East-West range = 0.10m (from GX2 at 0.10m to GX1 at 0.00m)
|