1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
|
Removing trailing traverses...
Concatenating traverses...
Simplifying network...
Calculating network...
Calculating traverses...
Calculating trailing traverses...
Calculating statistics...
Survey contains 2 survey stations, joined by 1 leg.
There are 0 loops.
Total length of survey legs = 10.25m ( 10.25m adjusted)
Total plan length of survey legs = 10.25m
Total vertical length of survey legs = 0.00m
Vertical range = 0.00m (from 2 at 0.00m to 2 at 0.00m)
North-South range = 10.25m (from 2 at 10.25m to 1 at 0.00m)
East-West range = 0.00m (from 2 at 0.00m to 2 at 0.00m)
|